Pinnacle Piping led the mechanical installation efforts for Structure Tone Boston at the Jones Day offices within the South Station Tower. This project included the installation of 45 fan power boxes and 3 Liebert CRAC units across two floors. Pinnacle partnered with STO on the pre-construction coordination efforts to ensure MEPs were concealed to the owners architectural requirements.